What ECSBC 2024 is

The Energy Conservation and Sustainable Building Code 2024 is published by the Bureau of Energy Efficiency (BEE) for commercial and office buildings, and its acknowledgements say it succeeds ECBC 2017. The code defines a building complex as one with a connected load of 100 kW or a contract demand of 120 kVA and above. Compliance with the baseline level is mandatory in the code. Two higher tiers, ECSBC Plus and Super ECSBC, are voluntary, and the foreword says future updates may raise the baseline.

How and when it is enforced depends on the authority having jurisdiction for your project, so ask your architect or the local authority which version and tier apply. This article is not legal or compliance advice.

Where controls and metering appear in the code

The table of contents shows that controls are not an afterthought. These are some of the sections that matter to a building's automation, read from the code's own contents:

ECSBC 2024 sections that touch building controls
TopicCode sectionWhat a BMS usually contributes
HVAC controls6.2.3, with extra controls for ECSBC Plus (6.3.9) and Super ECSBC (6.3.10)Schedules, setpoints and equipment sequencing for chillers, air handling units and fan coils
Testing and balancing6.2.6Trend records that show how the system behaves after balancing
Interior and exterior lighting controls7.2.2 and 7.2.3, with additional controls in 7.2.4 and 7.2.5Time schedules and occupancy-based lighting control
Check-metering and monitoring8.2.5Collecting and storing meter data in one place
Water metering9.2.6Logging water use alongside other building data
Controls and the Internet of ThingsAppendix A4Open protocols and integration between systems
Commissioning of building systemsAppendix A5Test records and as-built documentation

Read the full text of each section for the exact requirement. The table says where to look, not what each clause demands.

Where the controls sections of ECSBC 2024 meet a building's systems.

Where a BMS fits

The code defines centralised control as a single hardware and software system for observing and controlling a group of equipment. That is close to what a BMS does day to day. Our plain-English guide to a BMS explains the parts. A BMS also keeps the records that make audits and commissioning easier: trends, alarms and a log of changes.

HVAC controls sit at the centre of most BMS projects. We cover how that works in a hot, humid South Indian climate in HVAC automation in South India.

Ways to show compliance

The code gives more than one route. Section 3.2 lists meeting the mandatory requirements, an integrative compliance method and a standardised compliance method. Chapter 12 adds a whole-building route that uses energy simulation, with thresholds for the three tiers. Which is right depends on the building, so your energy consultant should choose with you.

Questions to ask before you specify a BMS

  1. 1.Which version of the code and which tier does the authority expect for this project?
  2. 2.Which of the controls sections apply, and who is responsible for each: the HVAC contractor, the electrical contractor or the BMS integrator?
  3. 3.Will the BMS use open protocols so meters, chillers and panels from different makers can connect?
  4. 4.Who commissions the system, and what records do you receive at handover?
  5. 5.Who holds the programming and graphics after handover, and who supports the site?

Our building management systems and HVAC automation pages describe how we approach this, and our authorised partners page shows the manufacturers we work with.

If you would like a second pair of eyes on your plan, book an online demo or contact the team. We will tell you plainly if automation is not the right fit.

FAQ

Questions people ask

The Energy Conservation and Sustainable Building Code 2024 is the Bureau of Energy Efficiency's code for commercial and office buildings. It succeeds ECBC 2017. The baseline level is mandatory in the code, and ECSBC Plus and Super ECSBC are voluntary higher tiers.

The code defines a building complex as one with a connected load of 100 kW or a contract demand of 120 kVA and above, across uses such as business, hospitality, healthcare, education and shopping. Whether it applies to your project depends on how the authority having jurisdiction enforces it, so check with your architect or the local authority.

The code sets expectations for controls, metering, monitoring and commissioning. It does not name a BMS as a product you must buy. A BMS is one practical way to meet centralised control, monitoring and record-keeping, and your energy consultant can confirm what your project needs.

We design, install and commission building management and HVAC control systems, which cover the controls, metering and records the code asks about. Formal compliance assessment and certification are done by qualified energy consultants and the approving authority. We work alongside them.

Keep reading

Related notes

Talk to the team

Bring drawings or book a live walkthrough

We design and commission home automation and BMS — we do not ship a kit and leave you with an app.