Conduit, panel space, curtain recesses and joinery cut-outs. A stage-by-stage guide to bringing automation into a project before first fix.
26 November 2026 · 3 min read
By Naveen Kumar R
Architects and interior designers decide where walls, ceilings and joinery go, and automation needs room in all three. The earlier an integrator sees the drawings, the more of that can be settled on paper. Our guide to how a villa automation project runs walks through the process from the client's side.
| Stage | What to settle | Who to involve |
|---|---|---|
| Concept and brief | Which systems the client wants (lighting, climate, curtains, audio-video, security) and whether the approach is wired, wireless or hybrid | Client, architect, integrator |
| Drawings and services | Panel room or riser location, conduit routes, power at curtain heads, space for equipment racks | Architect, MEP consultant, integrator |
| First fix (before plaster) | Cable and conduit in place, back boxes set, points checked against the drawing | Electrical contractor, integrator |
| Interiors and joinery | Recesses for curtains, joinery cut-outs for equipment, switch plates and finishes chosen | Interior designer, integrator |
| Programming and handover | Scenes, schedules and training; documentation and programming files to the client | Integrator, client |
In return, you should receive a scoped proposal that says what is included, where panels and cabling go and what can be phased.
Our authorised partners page lists the manufacturers we hold authorisations with, and our guide to choosing a company has the questions we think every client should ask us.
If you are an architect, interior designer or builder working in Bangalore, Chennai, Hyderabad or another South Indian city we cover, contact the team and send us the drawings. We will tell you what we would need and when.
If you would like a second pair of eyes on your plan, book an online demo or contact the team. We will tell you plainly if automation is not the right fit.
FAQ
At concept stage if possible, and no later than the electrical drawings. Conduit routes, panel space and power at curtain heads are far easier to settle on paper than after plaster.
Floor plans, reflected ceiling plans, electrical and MEP drawings, the interior designer's intent for lighting, curtains and joinery, the client's brief and the construction schedule.
Often yes. Cabling and conduit have to be in place before plaster, but devices and programming can be added later. A written scope shows what has to be done first and what can wait.
Yes. Send us the drawings and we will say what we need and when. We design, install and commission, and we cover South Indian cities from our offices in Bangalore, Chennai and Hyderabad.